Hi Ben
I've been following your project for a little while now, looking good
Cheers
Chris
Cheers mate, My current plan is to start building her back up and as a side project buy another sprocket carrier that I can mess around with (having it milled down etc)
From my calculations its 9mm to far over to the right, meaning you would only need to find 4.5mm to bring it to the centre.
My thoughts on this are to have the sprocket carrier milled down by 5mm. This would need doing on two places.
1) Outside face where the sprocket carrier meets the swingarm
2) The surface where the rear sprocket meets the carrier (This will keep the chain aligned)
Also to keep it looking neat I will use a sealed bearing instead of the open one that requires the rubber seal. Finally machine down the left hand spacer to the required size.
Make a right hand size one to take up the slack and hey presto!
I was going to refurb the brakes my self but there is a guy on ebay that will refuurb and paint for 60 quid a caliper and looking at his work he does a good job.